New non-swimmer pool
Lining surface | 334 m² |
Water surface | 205 m² |
The sport and leisure pool was modernized in the early summer of 2017 in just five weeks. The result is an attractive water park with an environmentally friendly pool for non-swimmers. Planning and execution were carried out by STEULER-KCH, who also lined the non-swimmer pool using the Bekapool system. This consists of precisely prefabricated concrete elements with integrated plastic lining that are quick to install and completely watertight.