Renovation of 25 m pool, teaching pool, children's pool, pool surround
Lining surface | 1500 m² |
Water surface | 450 m² |
From the end of 2021 to summer 2022, the Hanau Bäder GmbH and the architectural firm BZM Matthias Marhöfer successfully refurbished the Hanau Lindenau pool. The scope of work included the refurbishment of the 25-metre pool, teaching pool and the connection to the stainless steel children's pool with the STEULER Q7 system. In addition, the entire pool surrounds were renewed. The construction site was completed on schedule to the customer's complete satisfaction.