Bönnigheim - Freibad

STEULER-Q7

Services

Renovation outdoor pool

Projectdetails/Rinne
Finnland
Dimensions
Lining surface 255 m²
Water surface 160 m²
Completion
2014
Address
Bachstraße 40, 74357 Bönnigheim
Your Contact
Joachim P. Ostrowski
Joachim P. Ostrowski
Dipl.-Ing.
Head of Business Unit
Completion
2014
Address
Bachstraße 40, 74357 Bönnigheim

A pool with three levels was constructed at the open-air mineral baths in Bönnigheim. Each of the levels has a different depth and they are connected via overflows. All of the work involving the pool was performed by STEULER-KCH: from the demolition work and the pool lining and tiling work through to installing the fixtures and fittings and water circulation system.

Impressions